[Free] 2018(Aug) Ensurepass Microsoft 70-499 Dumps with VCE and PDF 111-120

Ensurepass.com : Ensure you pass the IT Exams
2018 Aug Microsoft Official New Released 70-499
100% Free Download! 100% Pass Guaranteed!

Recertification for MCSD: Application Lifecycle Management

Question No: 111 – (Topic 2)

You use Microsoft Test Manager (MTM) to manage your test environments.

You plan to test an ASP.NET website on various topologies (such as one-tier, two-tier, three-tier, and n-tier) to ensure that the website supports scalability.

You need to be able to deploy copies of predefined environments based on templates. What should you do?

  1. Create a System Center Virtual Machine Manager (SCVMM) environment for each topology and store them in the library. Use the library to deploy new environments.

  2. Create new standard environments with physical machines.

  3. Create new physical environments using physical machines.

  4. Create new standard environments with machines that run under System Center Virtual Machine Manager (SCVMM).

Answer: A

Question No: 112 – (Topic 2)

You are managing test cases by using Microsoft Test Manager (MTM).

You plan to test a part of your product on a specific configuration you create.

You need to ensure that new test cases in a specific test suite default to use this configuration without impacting other test suites.

What should you do?

  1. Create a new test plan for testing with the specific configuration.

  2. Select all test cases in the test suite and select the specific configuration.

  3. Select the specific configuration as the default configuration for the test plan.

  4. Select the specific configuration as the default configuration for the test suite.

Answer: D

Question No: 113 – (Topic 2)

You are using Microsoft Test Manager (MTM). A test case is already in production.

You need to modify the test case to indicate it is being reworked. What should you do?

  1. Change the test case state to Design.

  2. Change the test case to Blocked.

  3. Change the test case state to Closed.

  4. Change the test plan state to Inactive.

Answer: A

Question No: 114 – (Topic 2)

You are using Microsoft Test Manager (MTM). You are supporting a set of different configurations for your product.

You plan to prepare the test plan by assigning the tester for each test case. You need to configure the test plan to support this requirement.

What should you do?

  1. Assign the tester to each combination of test case and configuration.

  2. In the Assigned to field for each test case and configuration, select Tester.

  3. Assign the tester as the configuration owner for each configuration.

  4. Assign the tester to each combination of test suite and configuration.

Answer: A

Question No: 115 – (Topic 2)

You are using Microsoft Visual Studio 2012 to manage test environments for your company.

You need to set up a two-computer environment for running tests. The environment needs to include:

->A client computer running Windows 7 and

->A server computer running Windows Server 2008 R2 SP 1, which acts as the web server and the database server.

The server computer has already been created using Microsoft System Center Virtual Machine Manager (SCVMM).

You need to create a lab environment for testing this configuration. What should you do?

  1. Install a physical machine with the client configuration. Connect both the client and the existing SCVMM server computers with Visual Studio 2012 through the Server Explorer window.

  2. Install and configure a virtual machine with the client configuration by using Hyper-V. Connect both the client and the existing SCVMM server computers with Visual Studio 2012 through the Team Explorer window.

  3. Install a physical machine with the client configuration. Create a new SCVMM lab environment by combining both the client and the existing SCVMM server computers by using Lab Center in Microsoft Test Manager (MTM) 2012.

  4. Install a physical machine with the client configuration. Create a new standard environment, combining the client and the server machines by using Lab Center in Microsoft Test Manager (MTM) 2012.

Answer: D

Question No: 116 – (Topic 2)

You are using Microsoft Test Manager (MTM).

Your company has configured multiple test configurations.

You need to set all active test configurations as the default for all new test plans. What should you do?

  1. Select the Active state option for each test configuration.

  2. Select the Default option for each test configuration.

  3. Select multiple test configurations from the test plan.

  4. Select the Assign to new test plans option for each test configuration.

Answer: D

Question No: 117 – (Topic 2)

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. SharePoint integration and reporting are enabled.

You want to assess the progress of your team’s testing effort. To do this, you need to:

->Identify gaps in test coverage.

->Monitor test progress for each requirement, and.

->Identify how many test cases are passing or failing for each requirement.

What should you do?

  1. Open the test plan in MTM and look at the test plan status.

  2. From Team Explorer, open the Stories Progress report.

  3. From the team portal, open the Test Plan Progress Excel Report.

  4. From the team portal, open the User Story Test Status Excel Report.

Answer: D

Question No: 118 – (Topic 2)

You are using Microsoft Test Manager (MTM).

You need to assign test cases to testers so they will be able to find the tests they need to run.

What should you do?

  1. Click Assign to designate the tester for each test case, then click Filter when you run the

    test.

  2. In the Assigned to field for each test case, select the tester, then click Filter when you run the test.

  3. For each test case, select the tester in the Assigned to field and use a work item query to filter on assigned test cases.

  4. Create a test plan for each tester.

Answer: A

Question No: 119 – (Topic 2)

Your team is using Microsoft Test Manager (MTM).

You have a manual test case for a web page on which the user is required to enter information into several text fields. The test takes a long time to run. According to previous test results data, there are problems with testers entering data in the wrong fields.

You need to use MTM to eliminate the repeatability issues with the least amount of effort. What should you do?

  1. Break the test up into several shorter test cases to isolate the steps that have repeatability problems.

  2. Create an action recording and fast forward to repeat the test steps that have repeatability problems.

  3. Convert the test case to an automated test.

  4. Change the order of the test steps so the least repeatable steps are run first.

Answer: B

Question No: 120 – (Topic 2)

You are using Microsoft Test Manager (MTM). You are using the Microsoft Visual Studio Scrum 1.0 process template.

You are developing a test from an engineering document that has detailed verification information.

You need to ensure that the document is directly accessible whenever a tester runs a

specific step.

What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)

  1. Add a test step attachment.

  2. Add a test case attachment.

  3. Add a tested backlog items link.

  4. Add a test case link.

Answer: A,B

100% Ensurepass Free Download!
Download Free Demo:70-499 Demo PDF
100% Ensurepass Free Guaranteed!
70-499 Dumps

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.